Title: What should be checked after installation devices?
What should be checked after the installation of devices?

Check ItemCheck ResultCheck Result
1. Ground cables are connected correctly.YesNo
2. The fan assembly is installed correctly and connected properly.
3. Power modules are installed correctly and connected properly.
4. The power switch is in the off state (the rocker switch is in the OFF position).
5. Power cables are connected correctly.
6. Supervisor modules are installed correctly and connected properly.
7. Service cards are installed correctly and connected properly.
8. Switch fabric modules are installed correctly and connected properly.